Update to my projects list

Well my self-imposed deadline of Sept 15th has passed and the big list isn’t quite done. 19 out of 30 projects made it on the blog which leaves me another 11 to finish up. I could fill this space with excuses but I don’t care that much. Here’s a recap:

  1. New shelf + cable management solution for the desk
  2. Flexible lighting solution in the hall closet
  3. Storing books
  4. Medicine cabinet overhaul – I just completed this Sunday
  5. Organizing the guest bath cabinet
  6. Hanging TVs on the wall + hiding cables – halfway done because the bedroom TV is giving me trouble
  7. My new kitchen table + chairs – can’t wait to show this to you! 
  8. New pinboard for the office
  9. Planked wall
  10. New chairs for the office and guest room – no reason except cleaning spaces before taking pics takes time! 
  11. Curtains and shades updated- I wanted to have 2 more shades hung before blogging but that might take awhile
  12. Pegboards in the garage- is kinda useless until I get the workbench set up better. coming soon
  13. Storing wood in the garage for projects – while this is done it is pretty boring which is demotivating 
  14. New Cadillac, Old Garage
  15. Organizing paint for touch ups- an old project now holding old, some bad, paint
  16. Update on the raised garden beds 2 years later – sadly I tore out a lot of plants last month so the beds are recovering
  17. Covering up stains under the kitchen sink
  18. Shoe shelves in the master closet
  19. Organizing travel samples + luggage
  20. Updating hardware on the desk
  21. Sewing case makeover
  22. New privacy film on the garage window
  23. Bookshelf overhaul
  24. The guest room floors
  25. Gallery wall from Instagram prints
  26. Laminate floors through the hallway, closet and entryway
  27. New door frames
  28. Potting bench
  29. Sewing projects – I sewed a lot of things! 
  30. Rugs: Living room, kitchen, hall and office – will be on the blog as soon as I clean the kitchen rug really, really well

While I fully intend to keep blogging about these project, big and small, I’m also just really proud of how far the house has come this last year. I have been slowly upgrading to more permanent pieces that are good quality and fit the space a lot better. I do have some plans for the last few months of the year but nothing is decided just yet.

For now I’ll be taking a couple weeks off blogging and soaking up the last weeks of summer!

Closet Revamp

A lot has changed since I last posted about my Master Bedroom Closet back in 2013. While I really love having the white walls, gray shelves, updated lighting and track system for the curtains so much more has changed.

This post details the new baseboards, paint and lighting. 

In the second post I shared about the organization, shoe shelves and the clothing boxes.

Here’s what the shelves looked like back then:

 

Closet 2

and here’s what the main part of the closet looked like:

Closet 5

Here’s what has changed:

  • new laminate flooring in the closet
  • built out some shoe shelves on the left side
  • stacked up book boxes on the right side
  • added a basket for sandals
  • organized the red storage unit

Now, I could drag each of these out in a separate post but I don’t have time for that. So here we go…

DSC_0636

I already shared a blog post about how I prepped and installed the flooring in the master bedroom here but as you can see, it really does make the whole room look bigger.

IMG_6370

After the floors were done I began to reinstall the baseboards and then restock the closet.

On the far left of the closet I installed supports along the walls and then laid shelves across (just simple 1x4s). While I didn’t plan on it at a time, this created the perfect spacing for my shoe shelves.

DSC_0359

Underneath the shelves I have an old basket from Ikea for flip flops, sandals and shoes I’m too lazy to put away. This accounts for the majority of my shoes, I do have some boots up on the upper shelves but pretty much everything fits in here.

DSC_0362

And tucked in the back is a red set of drawers, also from Ikea, which has belts, some gloves and all of my travel sized toiletries:

IMG_7825

I won’t give a drawer by drawer account because: boring.

I like that I can easily pull out the drawers to restock my toiletry bag before a trip. Of course the laminate floors help with that.

IMG_7820

The right side of the closet is now filled with my book boxes (that I shared about here) which leaves plenty of room in the middle for hanging clothes.

On the top shelves I still have the fabric boxes for my pants, winter sweaters and bed sheets.

The other obvious change from 2013 is that the curtains are new, to match the mellow yellow wall color (recapped that change in this post)

All in all, I love how functional my closet is and the storage it provides. It may not be a huge, walk in closet with custom shelving but it does the job.

Updating the Guest Bath

When I started the challenge to blog all the projects I’d been working on, I promised myself not to start new projects.

Of course that didn’t happen.

So in August, while I was dog sitting for my parents, I got the desire to finally do something about the cabinet in my guest bath.

This one:

Bath 4-4-2015 (02)

The problem is simple. The sink and countertop are one continuous piece and stretch allll the way along the wall. Which I dislike. There are also stress fractures in the bowl of the sink.

IMG_6969

So after shoring up my confidence with a few YouTube videos, I turned off the water valves, unscrewed the faucet, then the P-trap, and began to wiggle the counter top loose.

I won’t lie, it was a pain in the ass and seemingly glued to the wall. But I got it out and soon it was chilling in the living room:

Screen Shot 2015-08-29 at 5.16.24 PM

Next up was the cabinet. After removing the doors, I used my hammer and crowbar to bust it to pieces and it came apart pretty easily.

IMG_6972

I tossed all those pieces outside and turned back to the empty space:

IMG_6974

Obviously when I installed the floor tiles back in 2013 I did not go under the vanity so it was a good chance to use up the spare tiles I’ve been hoarding saving.

First I did a little patching due to a crack in the concrete and then primed the subfloor. Putting down the new tiles was easy enough, although several of the adjacent tiles needed to be replaced. There’s just one more tile left to replace that goes right up to the toilet which will require a little more work.

IMG_6976

Once the tiles were in it was time to bring in the new cabinet. I’d picked it up from Home Depot and got a few of the workers to set it carefully in the backseat of the Cadillac. With some blankets to protect the frame and seat it was fine. My neighbor across the street helped me move it out of the car and into the garage.

Here’s the vanity and sink on the Home Depot website.

bath cabinet

The whole cabinet was leveled and then got screwed into the wall studs.

IMG_6983

Since the sink on this unit is off center there was a difference of 5″ which required a new p-trap. I also replaced the drain flange with a piece that included a new sink plug.

Before:

IMG_6987

After:

CSC_0352

Since I was reusing my newish chrome faucet, I took the time to really clean and polish it up. It did need the filter to be cleaned out since we have such hard water that it’s easy to get clogged up.

IMG_6979

If you’re confused, or would like a very basic sketch up of how this plumbing works, this site and diagram is a good place to start.

One problem I had is that the water supply lines were all sorts of cramped and barely reached up to the faucet.

IMG_6973

They were also leaking so I hired a plumber to come in for a couple hours to replace the lines and upgrade the drain extension to position the p-trap better. Money well spent!

Once that was done I could secure the counter by adding a bead of clear construction glue and carefully setting the counter in place. In order to get it plumb against the cabinet I had to take off a long trim piece from the tall cabinet so I’ll need to re-sand and paint that piece.

DSC_0354

One thing I love is the drawers which give me shallow storage for bath items so they don’t get lost in the deeper cabinet.

Top drawer is perfect for washcloths:

DSC_0347

Middle drawer is soap, matches and small glass jars with tweezers and nail clippers:

DSC_0349

Bottom drawer has hand towels:

DSC_0350

One last tip, when I was working on the cabinet I took off the doors so I could easily get to the plumbing components and my tools a lot easier.

IMG_7018

Here’s a final shot of the new cabinet:

DSC_0356

 

Desperate times…

Okay, I’m just a few weeks away from my self imposed deadline to blog about all the projects on this list so I can catch up and keep moving with new projects in the house. Except I’m wayyyy behind because I never seem to blog twice a week or with any sense of regularity, really.

So where do I get stuck? Primarily when it comes to photographing the finished project, uploading those pics to my computer and hitting publish.

Of the 30 total posts I wanted to share I’ve finished 16 of them – which to be fair, isn’t bad, but also means I have 14 more to do.

Therefore desperate times, desperate measures.

For the month of September, and starting now, I’ve blocked Pinterest and other time-sucking sites from my computer. I’ll be completely off Facebook unless I’m working specifically in the groups I mentor.

And, this is the big sacrifice here, I will be wearing shoes. All day long. It’s something I need to do now anyway with the ankle braces I got after my fall in July. With wearing tennis shoes all day I am more easily able to do small chores around the house, run out to dump trash, work in the backyard and it feels more like “work mode.”

While I can’t take off time from work just to focus on blogging (ha! what a dream that would be), I am giving myself time to take the photos and finish up those posts I wanted to do.

Here are the ones I hope to finish by Monday:

  • bathroom cabinet
  • storing spare pieces of wood
  • organizing shoes
  • luggage + travel size storage

See the full list here. And wish me luck.

 

Where did all the books go?

A few years back I had floor to nearly ceiling bookshelves in the office, dark green walls and a ton of books:

DSC_0192

and then I decided to remodel the room and in an effort to make it lighter I sold all but one of those bookshelves; I haven’t missed all the space and took the chance to drastically downsize my collection.

Although I still have plenty of books, I decided to box up the series that I don’t read frequently and only keep out the ones I read and reference regularly. At some point I might add built in bookshelves to the guest room but until then I like having them organized.

To start I picked up a few dozen book boxes from UHaul and then I organized the books as much as possible, to keep books from the same authors together. I boxed up 17 boxes and to keep it all straight I typed each of the titles, authors and series numbers into an Excel spreadsheet.

I designed each page to be just one sheet when printed and then put a copy in each box. The top of the box was closed with clear package tape and a bright Post-it with the number of the box.

(Here’s a copy of that template if you’d like to use it yourself)

At first the boxes were stacked in the guest room closet but it was taking up too much space. After some consideration I moved all the boxes to the master bedroom closet since the deep alcove is hell on hanging clothes. The best part is that I can fit them 2 boxes deep and 17 boxes doesn’t take up the whole space.

boxes

I do have a few build projects on the horizon for the books I did keep – namely those in the living room but that’s for another post.

down the hallway we go

Last time I left off on the saga of the floors I had just finished the guest room and run the laminate floor boards across the hall to the threshold at the office.

DSC_0160

You can see the oh-so-classy laminate tiles that were in the hallway. Their only redeeming feature was that it was incredibly hard to see dirt because they were also impossible to clean.

Once I started down the hallway I knew that I wanted to get to the end which of course presents a problem… you can only lay a board out as far as the previous row is laid. Which meant I needed to go all the way through to the living room in order to get 5 boards wide in the hall.

Here’s the view from the master bedroom when I started:

IMG_7296

 

As you can probably tell I’ve removed all of the door frames and baseboards before putting down the underlayment.

By the time I got the boards through to the hallway bathroom I could go into the closet. Here’s a reminder of what it looked like after I took out the carpet to add laminate like the bathrooms, added some lighting and used up sample paint to make a colorful striped wall:

DSC_0001 copy

And, with movie magic, after the new floors were installed:

IMG_7414

p.s. I changed up the lights here too and the rope LED light is super bright. See details here.

In this next pic I’m standing in the living room looking back down the hall with the front door to my right:

pic to rotate

 

In order to finish row 5 in the hall (which is the left most row in the pic), I had to take the boards into the entryway where the front door swings in.

Yes, this is the other side of my odd wall in the office if you’re trying to orient yourself.

So in order to get those pieces correct I needed to cut the entryway and lay that down. Here’s what it looked like laying out those boards:

IMG_7321

As you can probably tell I needed to take out the carpet in the living room and prime the subfloor. Since the furniture in here had nowhere to go I would literally remove 3′ of carpet at a time and prime as I went.

IMG_7330

It was slow going but eventually I got all the rows in and secure, some with multiple angled cuts so… that was fun. Unfortunately I didn’t leave enough of a gap for the transition strip by the front door so I did have to go back and trim it back.

Now of course I thought I’d do the hallway and take a break but once you start taking out carpet it just makes sense to finish the job. Next time I’ll detail now I did the biggest room (living and dining), those annoyingly precise cuts around the fireplace and backing up into the kitchen.

But here’s a finished view of the hallway (with only a few door frames that need to be finished):

hallway finished

and with my runners from Ikea to keep the dogs from slippin’ and slidin’:

hallway runners

 

 

Guest Room Gets Fancy

After the master bedroom, the guest room was the one with the worst carpet and I was so ready to get rid of it.  Shortly after finishing the office, I started moving furniture and got out the trusty crowbar and box cutter.

Here’s what the carpet looked with mystery stains and all:

DSC_0086

and in the closet,

2014-02-28 (13)

While the closet carpet didn’t have horrible stains, it also didn’t match the rest of the room. Of course I just finished the baseboards in there but thankfully had an easy time prying them out again.

Here’s the carpet coming out, removing all doubt that it was nasty stuff:

DSC_0087

DSC_0088

Just like the other rooms, I started with filling the cracks in the subfloor.

DSC_0089

By this room I’d pretty much mastered removing the nails from tack strips without destroying the concrete. The carpet pad in this room was much thicker but that meant they used heavy duty glue (which you can see in that dark mark in the pic above) which I had to scrape up with the crowbar as I painted.

And, as always, there was a ton of debris so I was constantly cleaning:

DSC_0095

After the concrete filler dried I painted the subfloor white to block out all the stains.

DSC_0096

And then, once it dried, it was time to roll out the underlayment. For those who don’t know, underlayment acts as a barrier – not so much for moisture but sound – and prevents the hard back of the floor from hitting the subfloor when you walk. It’s relatively thin but does the job.

Here I pulled out a few boards that were acclimating to the room and used them to anchor the underlayment. It doesn’t get glued or adhered to the floor in any way.

DSC_0114

When you’re installing make sure the edge with the sticky tape is away from the wall – you’ll need that to adhere to the second piece that unrolls. Occasionally you’ll need to make cuts which is easy with the box cutter. Such as these small walls that frame the closet:

DSC_0117To get the correct length I pulled the underlayment out from that little wall, unrolled it to the far wall and held it there with the crowbar. Using a box cutter I sliced the underlayment – remember it’s thin – and then pushed it back towards the wall.

DSC_0120

Since you don’t lay out the whole room it’s pretty easy to work around these obstacles. I simply sliced around the wall with the box cutter to remove the section.

DSC_0125Just like the other rooms I started with a long row along the back wall and then built my way out. However, I do have a trick to show.

The first 3 rows are a real bitch because every time you tap in a board it wants to move and you want to keep a gap for expansion.

So I cut some scrap wood and nailed it to the wall just at the joints between the boards like so:

DSC_0136

Other than the cuts around the transition to the closet in the first row, it went smoothly!

DSC_0135

This was probably the first of 5 cuts I made, since it was so tight. For these straight cuts I mostly used my jigsaw but when I needed to make end cuts I relied on my miter saw.

Once the first couple of rows are in the work goes quickly. Roll out underlayment. Lay boards. Tap them into place.

DSC_0156

Fan set up to keep me from melting:

DSC_0159

And done:

DSC_0165

One thing I did learn by this, my third room, is that you don’t need to lay out the whole row and tap it in together. I know! It saved soooo much time. Instead you just line up the board on the far left, tap it into the board above it. Then position the next board, tap it to lay flat and when it’s almost flat you hit it hard with the mallet at the joint.

So easy. So satisfying to whack things.

Once the floor boards were mostly in I could do the transition to the hallway and this was one room where I didn’t need to stop at the door jam. Since I did transition strips at the master bedroom and office these boards could go through to the office threshold.

DSC_0160

While the boards don’t line up perfectly like I wish, you can’t really tell unless you’re inspecting them for imperfections.

I also took the time to touch up the wall paint with a small can of Frosted Jade from last year.

Once the floors were done I went back to re-install all those baseboards.

DSC_0161

The only sections I left off were around the door where the new door frame will come in (soon!).

Alright, in the saga of the master bedroom I showed you how to install the boards (the long, hard way), in the office post I laid out all the tools and now I’ve shown you the underlayment and a quick way to install.

Next we head down the hallway, do the closet and then conquer the largest space yet and a series of increasingly complicated angled cuts.

After that it’s just the transition strips and the whole house is done.