Master Bedroom Master Plan

I realize that I haven’t actually spelled out my plan for the Master bedroom re-do lately. I’m in the midst of texture and paint but here is the vision (previewed in this post):

Photobucket

The walls are going to be bold but the actual hue is a secret. We’re starting at the top and working down:

  • smooth out ceiling rough spots, prep for paint
  • take down the curtains temporarily
  • paint the ceiling

Once that uber messy step is done I’ll be able to work my way down to the floor:

  • tape off the doorways, remove switch plate covers and lay new plastic over the carpet
  • paint walls with base + color
  • give trim (door ways and closet header) a fresh coat of white paint

Then I’ll be ready to reinstall a bunch of stuff:

    • rehang the lights
  • Photobucketreinstall the shelf Photobucket
  • reinstall switch plate and outlet covers
  • rehang the curtains
  • install new white baseboards

Then, we’re approximately looking at 2015 now, I can bring in the furniture including:

  • the bed frame currently in the garage and queen mattress & box spring currently in the living room
  • the headboard (once painted) from the garage
  • the bookshelf (once painted) from the garage Photobucket
  • two new nightstands (once painted) from the garage
  • the dresser (once painted) which is currently in the closet Photobucket

Do you sense a theme here? Yep, lots of painting! So far I’ve been working on the bookshelf turning it white so that the accessories can really stand out. The colors for this room are going to tie into that red, black and white.

Pretty much all of the furniture will be getting fresh coats of white paint, even the Ikea furniture. There may be a Hemnes dresser (above) post to install a design so it’s not plain.

I have also just envisioned a new project where I use some of the warped wood from my garage for a jewelry holder. I’ll be moving the circle mirror from Ikea across the room too.

After the room is painted and the furniture is back I’ll recreate the photo wall above the bed. This picture is pretty old and since then I’ve updated a few more pictures. I have one more to shoot and the large empty frame on the top right was painted black (see more in this post).
Photobucket

I do have a few more prints to order to fill up the last few frames but I’m excited to get the pictures back up and the room done!

Later Projects

Eventually I’d like to replace the ceiling fan with a black or silver pendant lamp, maybe once with mercury glass. This is pretty much a big “wait and see” type project since it will depend on what I find so in the meantime I’ve pinned a bunch of inspiration on this board.

Then, the hardwood floors throughout the bedrooms and hallway is the next goal. I would like dark floors, but again we’ll see what the budget finds.

I’m just about sold on the idea of dark laminate floors in the bathrooms to contrast the white and rice grain but that’s about where the planning has stopped.

Working Around the House

After last week’s Memorial Day Marathon of work, I had just a few follow up things to complete in the bathroom.

The new master bathroom toilet looked like this:

 Photobucket

due to tiles being pulled up. So I recovered a few of the tiles and cleaned them up. First I had to make a template:

Photobucket

Once the template was complete I laid it out on the tiles and use a box cutter to trim down the remnants. There was a lot of shaving the pieces to make them fit but finally I was left with this:

Photobucket

The tiles were pretty dirty so a magic eraser to scrub them up helped. I plan on tearing out those baseboards around the back and sides so I didn’t really fuss about how ugly they are.

With the tiles in place I could add a bead of caulk around the joint:

Photobucket

The caulk doesn’t come out that smoothly of course so I use a water bottle to spray my fingers and then smooth it out, squishing it into the gap. Since caulk is sticky and gross I use a piece of newspaper to wipe the caulking off the fingers as I work.

I got some better shots when working on the toilet for the main bathroom.

Before:

Photobucket

After:

Photobucket

After getting that chore done I worked on another little project. I picked up this hook at Home Depot last year and used one for robes in the bathroom.

Photobucket

Since I only used one in the bathroom the second one replaced these 3M command hooks at the front door:

Photobucket

Not a big change to the after but I like it:

Photobucket

You might notice in the top pic that the front door is open although it’s dark outside… being in this evil transition to the hot, icky days of summer that’s probably the best thing I do to keep cool without doubling my electric bill.

As soon as it gets uncomfortable hot I will turn off each ceiling fan, dust the blades and reverse the airflow (there’s usually a small up/down button near the lights). There’s no universal clockwise = cool weather, counter clockwise = hot weather because fan blades come in so many designs. So I just stand under it until the cool air is flowing down.

Then I’ll hose down the screens from the outside – with the window closed obviously – and dust the tracks to get rid of any spider webs. Quick dust of the window sill and I throw open the windows for summer. It’s hard to get a cross breeze in a halfplex since basically half the house is a shared wall with no windows.

Neither bathroom has a window and there’s a long hallway from the bedrooms to the living/kitchen. So I make the most of it – two windows open in the kitchen plus the locked screen door and living room window keep the front of the house cool. The tree in the front shades this side of the house well and I have a ceiling fan in the dining area and table fan in the living room.

Down the hall each of the bedrooms has a fan going, pretty much 24/7. I keep the light off unless I’m working in the office or in the bedrooms and the windows are left open. The master bedroom has a sliding glass door that I leave open, the screen door keeps out most of the flies except when the dogs open it to go outside.

There have been summers where it gets up to 110 or 115 and still I don’t keep the AC on. I figure that once I get used to it I get lazy and since I’m home most of the day it’s a big expense. When I’m hot I’ll grab an ice pack from the freezer, cool water or an otterpop and relax for awhile.

Right now I’m working on new paint and wood for my outdoor swinging bench, an idea for the large chest in the living room with the hinged top and painting furniture for the master bedroom.

One last project today and that’s the final door for the house! After painting both bathroom doors, the master bedroom and guest bedroom and hallway closet doors it was time to finish it up with the office.

Now a little history, I took down this door right after I moved in because I was trying to fit the giant desk into the room. It didn’t work. Yep, Dad had to disassemble the desk to make it fit. Plus the door was ugly. Seriously bad. Look:

PhotobucketYou know this was a long time ago because I have zero storage in the garage! Just the couch and a pile of boxes.

Yeah, so pretty quickly I grabbed the base paint and covered up the ugly and this door became my work table for years.

Photobucket

Well I finally finished the other doors and having one out of commission was handy because I could work on painting the hinges and door handles. So I finished up painting the door white:

Photobucket

And luckily the door was both light enough and the carpet high enough that I could hang it and install the hinges without killing myself:

Here it is in the hallway:

Photobucket

And finally installed 3 years after I took it down:

Photobucket

You know what’s next, right? Yep, taking that $18 bookshelf from Ikea and painting it too – time to haul that into the garage and get started!