A house is a project, there are always things to do, refresh, repaint and plant. So here’s my list of on-going projects. It will all be complete when I sell the property so I better settle in!
Actually, I started this list while compiling the page for my house tour and realized I would never get that page finished if I waited until all these projects were ready.
Front Yard:
cutting back grass around sprinkler headsdone Aug 2011create a rock layer in walkway flowerbed for gardening hosedone Aug 2011
replace the garden hose holder in the front yarddone Aug 2011dig up rose bush that hasn’t produced since 2008done Oct 2011- paint exterior trim on kitchen window
limb up sugar mapledone December 2011- repair gutters and downspouts
- buy or make rain barrels
- grind down the tree stump
replace gate latch pull stringdone Aug 2011- secure/repair lattice porch cover
replace front door screendone July 2011
Side Yard:
- remove the layer of small rocks (started Aug 2011)
install composter bindone July 2011- replace gutters and downspouts
- buy or make rain barrels
- lay down sod or moss or plant trees
- fill in with pots of flowers
- cut down tree and grind down stump
wire the sprinklers to the automated systemdone Aug 2011plant something pretty under the guest room windowDone Aug 2011 here
Main Bathroom:
buy and install new low flow toilet– done May 2012 here- replace the sink faucet
- install new shower head with detachable piece
-
finish painting the door– done Aug 2011 here
replace door hardwaredone Aug 2011

remove broken door hookdone Aug 2011- replace vents
- touch up caulk around
bathtub, baseboards and cabinets - replace the floor with vinyl tiles
- remove funky frog decal on the wall
- replace light fixture with something light and delicate
replace towel barsdone August 2011 here
Master Bathroom:
install new low flow toilet– done May 2012 here- replace the sink and faucet – purchased new sink Dec 2011
- replace light fixture with something pretty – purchased Dec 2011
- touch up wall paint and the ceiling
- replace vents
paint door and trim whitedone Aug 2011 hereupgrade the door hardwaredone Sept 2011- replace baseboards (possible quarter round with bead board)
- replace vinyl tiles on the floor
- install bead board on walls
install new towel bar and hand towel hookdone August 2011 here
Hallway:
- touch up baseboard with caulk
touch up wall paintdone Oct 2011scrape ceilingdone Feb 2012- texture and paint ceiling
- touch up door frame paint
paint doorsdone Aug 2011 here- finish adding baseboards
Kitchen:
- replace the window blinds with roman shades
- fix the granite piece that’s sagging
replace the door and drawer knobs– done May 2012buy a new fridge/freezerdone (got a used fridge in Aug 2011)
I’m breaking the new fridge/freezer down into the following steps:
continue to test the new fridge/freezer to ensure it’s safe to use– done Sept 2011!purchase or repurpose containers to organize the freezer space– done Oct 2011swap units (old fridge/freezer to garage)done Sept 2011use chalkboard paint on the old fridge/freezer to track food outsidedone Oct 2011
My inspiration from this source for the painting.
Living Room:
paint front door whitedone August 2011
replace front door frame- touch up paint and baseboards
- repair or replace broken tiles around the fireplace
- test the fireplace for utility
- replace grate on A/C
- install hanging light in living area
- scrape the ceiling
- re-texture ceiling and paint
Office:
- finish baseboards around the closet
- finish scraping the ceiling
- paint the ceiling
- secure bookshelves (earthquake proof)
- replace the carpet
paint and rehang the door– done May 2012hang new photos frames– done Oct 2011purchase one more CD size bookshelf for librarydone Aug 2011
Guest Room:
- install baseboards in the closet
- touch up paint on wall and closet doors
- replace carpet
- paint ceiling
- replace ceiling fan
- prime and paint paint the walls
- replace the baseboards – removed old May 2012
- replace the carpet
- finish black frame photo wall
- replace ceiling fan bulb cover or replace ceiling fan
- update the headboard (poss paint)
paint the doors white– done Aug 2011update door hardware– done Aug/Sept 2011scrape the ceiling– done Feb 2012- paint ceiling
replace last two outlets and cable plate– done May 2012 here
Garage:
- finish painting the walls with primer
reorganize holiday containersdone Aug 2011reorganize dog stuffdone Aug 2011- hang ladder on the wall
- cut and cap off copper pipes for water softener
move out boxes of rocksdone Aug 2011- replace dryer with more efficient model
- paint the door to house
- repair drywall hole by garage door
- replace the door frame going into the house
replace the door handle on the screen door(done Sept 2011)
Whole House “When I Win the Lottery” Projects
repair or replace the heater/ACworking well as of Aug 2011, will do a thorough check up in 2012- power wash siding
- paint the house exterior
- replace windows and frames
- check roof for repairs, possibly replace
- replace the gutters and downspouts







Pingback: Cleaning the Sideyard | My Friend Kelly