My Friend Kelly


Day 98 Update
September 6, 2009, 11:56 pm
Filed under: 99 days

If you’ve been tracking my progress on the master list for the past 3 months you’d know that I was this close to giving up.  A pain setback, job loss, job gain, stress overload and sleep deprivation have made this a challenging summer!

And yet, in the past 48 hours what can only be described as a flurry of activity. I’ve painted, peeled, moved, made calls, cleaned and not quit.  Whew, thank my stars I planned on finishing this on a holiday weekend!  I’ll post a re-cap later on but here’s what I’ve accomplished in September:

2        Figure square footage of front and back yards      Yard – DONE September 5th

3        Move rocks to garage                                       Yard – DONE September 5th

4        Price sod                                                                Yard – DONE September 6th

5        Trim dead branches on trees                        Yard – DONE September 5th

32      Paint the baseboards                                        Living Room – DONE September 6th

35      Get quotes for replacing frame                           Living Room – DONE September 5th

37      Paint front door trim                                         Living Room – DONE September 5th

59      Paint door trim in hallway                                  Hallway – DONE September 5th

60      Replace hallway light bulbs                                Hallway – DONE September 5th

63      Paint baseboards in hallway                               Hallway – DONE September 5th

74      Donate old clothes to Goodwill                      Master bedroom – DONE September 5th

77      Take nicer clothes to consignment                     Master bedroom – DONE September 5th

82      Peel off fish trim                                                            Bathroom #2 – DONE September 6th

86      Mop the bathroom floor                                    Bathroom #2 – DONE September 5th

93      Scan family photos and organize                         Online/Other – DONE September 6th

I do have just one more item to finish, hopefully tonight:

100     Take a SPA day!                                             BONUS

Do check out the original post as I’ve added before and after pictures.



List Update
August 25, 2009, 2:40 pm
Filed under: 99 days

Well it’s T-minus 13 days to finish the list and I have 17 more things to do.  And I start a new job, including 2 days out of town training, today. Gulp. Might I note that 4 of the 17 items are painting projects that have been ongoing for weeks. Double Gulp.

I figure I can take a longer lunch sometime soon and finish 77 & 74 once those clothes are ironed (note to self: iron clothes).  I have started peeling the fish trim (#82) but it’s going to take a few hours on the step stool to get all that glue off.

The price quotes for sod and the window frame can be done, maybe next weekend, by calling around town. If I get those numbers together I can call on my lunch break this week.

A few of the items were going to be done last weekend but my Dad had to put in overtime at work. I don’t know if I am willing to trim the tree branches and go in the attic to replace the hallway lights without backup.

Finally, the only item I can say for sure will not be completed is scanning all these family photos. Especially since Mom dropped off another few hundred on Friday.  I will count that a success if I can hook up the scanner and reinstall the software.

Left to complete:

2        Figure square footage of front and back yards      Yard

3        Move rocks to garage                                       Yard

4        Price sod                                                                Yard

5        Trim dead branches on trees                        Yard

32      Paint the baseboards                                        Living Room

35      Get quotes for replacing frame                           Living Room

37      Paint front door trim                                         Living Room

59      Paint door trim in hallway                                  Hallway

60      Replace hallway light bulbs                                Hallway

63      Paint baseboards in hallway                               Hallway

74      Donate old clothes to Goodwill                           Master bedroom

77      Take nicer clothes to consignment                     Master bedroom

82      Peel off fish trim                                                 Bathroom #2

86      Mop the bathroom floor                                    Bathroom #2

87      Price replacement light fixture                            Bathroom #2

93      Scan family photos and organize                         Online/Other

100     Take a SPA day!                                             BONUS

And I really want to do that last one…. see I have the goodies all ready:

spa day prep

spa day prep



99 bottles of beer…
August 4, 2009, 1:00 am
Filed under: 99 days, Family

… in my fridge! Well, not quite that many but I do keep some on stock for the necessary bribing that must occur for me to complete this dang list.  Like for my cousin who helped me haul baseboards, my uncle who programmed the A/C unit and of course my Dad who installed baseboards, found me some nifty tools and re-textured a wall in the hallway this weekend.

Due to the help of family (and beer) here’s what’s been accomplished since my last update:

39      Price replacement shower head and faucets    Bathroom #1 – Done July ?
57      Finish filling picture frames                Hallway – DONE August 1st
62      Program A/C unit                             Hallway – DONE July 28th
68      Choose a paint color                         Guest Room – DONE July 27th
85      Clean the wood cabinets and doors            Bathroom #2 – DONE July ?
88      Price replacement shower heads and faucets   Bathroom #2 – DONE July ?
90      Catalog books I own                          Online/Other – DONE August 2nd

That leaves me with just a few more items to finish by Labor Day. Namely:

2        Figure square footage of front and back yards  Yard
3        Move rocks to garage                           Yard
4        Price sod                                      Yard
5        Trim dead branches on trees                    Yard
7        Plan backyard hardscapes                       Yard
20      Organize kitchen cabinets                       Kitchen
28      Touch up brown paint on walls                   Living Room
31      Measure the couch for a custom slipcover        Living Room
32      Paint the baseboards                            Living Room
34      Get color samples of the paint and carpet       Living Room
35      Get quotes for replacing frame                  Living Room
37      Paint front door trim                           Living Room
38      Price replacement light fixtures                Bathroom #1
43      Mop the bathroom floor and clean up paint       Bathroom #1
44      Paint baseboards                                Bathroom #1
59      Paint door trim in hallway                      Hallway
60      Replace hallway light bulbs                     Hallway
63      Paint baseboards in hallway                     Hallway
64      Sort and organize linens by size                Guest Room
69      Take down and wash mini blinds                  Guest Room
74      Donate old clothes to Goodwill                  Master bedroom
77      Take nicer clothes to consignment               Master bedroom
82      Peel off fish trim                              Bathroom #2
86      Mop the bathroom floor                          Bathroom #2
87      Price replacement light fixture                 Bathroom #2
93      Scan family photos and organize                 Online/Other
99      Organize work files and archive                 Online/Other
100     Take a SPA day!                                 BONUS

Gotta get workin’!!!

Oh look, I suddenly got productive!

1        Distribute soil in back flower beds            Yard – DONE August 3rd

36      Have cable company out to fix tvs               Living Room – DONE August 3rd

*no need for a cable guy; 15 minutes on the phone and it was fixed!!

49      Prime and paint door frame for closet           Office

office closet

office closet

an hour later:

with paint!

with paint!

96      Update movie database with films I’ve watched   Online/Other – DONE August 3rd



99 days – work in progress
July 12, 2009, 7:25 am
Filed under: 99 days, Housework

A few more things accomplished this week. After getting a lot of the little tasks out of the way in June it was time to finish a few of the more complicated items.

I didn’t have a mop…. so I found one I liked at a good price and ta da!

27      Mop kitchen floor                                            Kitchen – DONE July 10th

Paint prep is brutal. Lots of cleaning, taping, throwing up plastic on the walls and drop cloths on the floors. It took 3 coats but I finally finished:

52      Paint closet header white                                  Office – DONE July 10th

53      Paint door trim                                               Office – DONE July 10th

That makes a grand total of 59 items completed on the list! Now that I’m at nearly 60% complete with this list it’s time to hit the harder items that involve a larger time commitment.  Such as…

Today we tested the sprinkler system in the backyard and I cleaned out more of the dead grass and branches. My goal this week is to complete:

7        Plan backyard hardscapes                                 Yard

And I’m slowly narrowing down my favorite pictures and scanning them so I can check off:

57      Finish filling picture frames                                 Hallway

My uncle is back in town and was kind enough to give me an interview for a newspaper article I wrote on A/C maintenance. He will hopefully be helping me with

62      Program A/C unit                                                    Hallway

A little more prep work this week; I printed out my rental history at the video store, I’m moving books from the shelves so I can paint in the office and cataloging as I go and I am nearly done transferring photos (4GB already done!).  By next weekend I should have finished:

90      Catalog books I own                                         Online/Other

96      Update movie database with films I’ve watched    Online/Other

98      Organize my photos and backup on USB drives      Online/Other

Of course I bought 3 new books today so it’s a work in progress – just like me!

I purposely excluded items that have to be done and redone like dishes, laundry and vacuuming. Right now I’d love to mop the bathrooms, wash the mini blinds and finish up some painting but my parents are sleeping. Sigh. I guess tomorrow is soon enough!



Day 21
June 21, 2009, 7:07 pm
Filed under: 99 days, Housework

It’s been a busy two weeks, let’s catch up on the list. Last Sunday I was accomplishing this:

18      Clean out Fridge and wipe shelves                      Kitchen – DONE June 14th

when my back went out.

This happens often, no need to worry.  A long day on the couch with nothing but movies and sleep is usually great. Unless you’re me, missing a shift and work and worried about being able to move on Monday morning.

Shout out to US pharmacuticals! Back on my feet and in less pain by Wednesday when I started tackling the rest of the list:

41      Clean the mirror                                              Bathroom #1 – DONE June 17th
45      Clean desk chair                                              Office – DONE June 20th
48      Polish desk, drawers and sides                            Office – DONE June 20th
54      Wash 1 window in office inside and out                Office – DONE June 21st
56      Clean air vent in hallway                                    Hallway – DONE June 16th
61      Tack down phone cord in hallway                       Hallway – DONE June 20th
66      Vacuum floor and closet                                   Guest Room – DONE June 20th
67      Wash 1 window in guest room inside and out        Guest Room – DONE June 21st
78      Wash sliding glass doors inside and out                Master bedroom – DONE June 21st
84      Price new toilets                                             Bathroom #2 – DONE June 21st
97      Update Racers and Savers thread                       Online/Other – DONE June 16th

That makes 52 things accomplished in 3 weeks.  Woah. See? I work better with deadlines! In college this meant I could finish a paper, study for finals and attend a debate tournament without breaking a sweat. Now it means my house looks better in a very short timeframe.



Day 13
June 14, 2009, 4:29 am
Filed under: 99 days, Housework

This week has been a little weak on the postings primarily because I felt like crap and didn’t get a whole lot accomplished.  Except sleep. I definitely got a lot of sleep!

I’m glad that I got so much done the first week (36!) so I could rest this last week and not get behind.  I know, no one is forcing me to get this list done but I’m my own worst enemy.

See, I’m in my own little world. But it’s okay, everyone here knows me!

After a solid 12 hours of sleep yesterday I set out to get some things done this morning.  As you can see from the previous post I spent some money but am still doing rather well on my monthly budget.  Here’s my accomplishments for the day:

21      Price new kitchen door knobs               Kitchen – DONE June 13th
22      Price dishwashers                          Kitchen- DONE June 13th
50      Put more pictures on the wall              Office- DONE June 13th
70      Price wall mounted lights                  Master bedroom- DONE June 13th

If you want to access the original post that has been updated with each completed task you can find it here.



Day 7
June 8, 2009, 1:55 pm
Filed under: 99 days, Housework

It’s been a busy few days, not all of them uber productive round here.  Friday was a nice day off when I picked up dinner after work (free with coupons) and spent some time with my Grandpa for his anniversary.  Saturday I painted in the garage, went to a comedy show with Mom and then work from midnight to 2am. Sunday was largely relaxing with just the closet project to focus on before working again that night.

I hope this week will see me doing all the pricing I need so I can adjust my July budget accordingly and also making the rest of the painting decisions.  Here’s what I’ve accomplished the last few days:
14      Extend gray primer the length of the wall             Garage – DONE June 6th

16      Touch up gray primer on wall                             Garage – DONE June 6th

71      Pull out boxes of clothes                                   Master bedroom – DONE June 7th

73      Clean off shelves in closet                                 Master bedroom – DONE June 7th

76      Sort clothes                                                   Master bedroom – DONE June 7th

83      Pick out paint for bathroom walls                       Bathroom #2 – DONE June 6th

On a side note: Congrats! to the incomparable April for finding her first home and getting a great deal on it! I hope the escrow process goes smoothly and your summers are soon filled with home improvement type projects that will similarly drive you batty.



Day 4 and counting
June 5, 2009, 2:11 am
Filed under: 99 days, Housework

Personally I think the burst of productivity at work is simply carrying over at home where I get more personal enjoyment from accomplishing tasks. Sadly, this isn’t getting me far at work because even though summer is our busiest time of the year, the economy has slowed enough to influence our work.

So I’m archiving, finishing scanning projects I started months ago and putting a huge emphasis on quality and getting my invoices correct the first time.  I refuse to take on the work of the other slackers in my department though (at least not without a raise).

But enough about the boring stuff, today is Day #4 and I finished 12 things!

11      Rearrange the couch in the garage                     Garage – DONE June 4th

12      Recycle plastic bags in car and garage                Garage- DONE June 4th

13      Collapse packing boxes                                     Garage- DONE June 4th

40      Wash bathroom rug                                         Bathroom #1- DONE June 4th

46      Measure for baseboards                                    Office- DONE June 4th

55      Measure for new bookshelf                                 Office- DONE June 4th

65      Measure walls for square footage for paint   Guest Room- DONE June 4th

72      Select accent paint Master bedroom- DONE June 4th

75      Select paint color       Master bedroom- DONE June 4th

80      Measure bedroom for baseboards                        Master bedroom- DONE June 4th

81      Measure corner for TV cabinet/hutch   Master bedroom- DONE June 4th

89      Wash the bathroom rugs                  Bathroom #2- DONE June 4th

That makes and even 30 things accomplished in just 4 days! It’s amazing how much I can get done when I’m not procrastinating.   This weekend I’m likely to finish up the small paint projects that have been plaguing me for months and then do some cooking for next week’s meals.  The weekend after this one I’ll try to tackle the big clothes projects.



Day 3 Recap
June 4, 2009, 3:51 am
Filed under: 99 days, Housework

Well I feel like crap on toast so an uncharacteristically short post today. I managed to get a few things done:

10      Price chest freezers      Garage – DONE    June 3rd

42      Measure the mirror space        Bathroom #1 – DONE   June 3rd

58      Price entry way mirrors           Hallway – DONE June 3rd

Here’s hoping I bounce back tomorrow and get a few more things accomplished.



Busy Day
June 3, 2009, 5:02 am
Filed under: 99 days, Housework, Yardwork

Don’t be fooled into thinking that I’ll be finishing all 99 things by the end of the week or even the month!  Most of the tasks on my list involve two of my nightmares: making decisions and lots of prep work.  I can guarantee I’m not going to blow through 5 or 6 of the larger painting projects on a week night, ever.

But for now I’m really enjoying getting some of the smaller tasks out of the way. Mostly these are chores that aren’t pressing but bug me to know they’re not done.  Like tightening the doors on my kitchen cabinets.  That’s done (except two screws are missing) and now when I get popcorn or cups I won’t be annoyed that the door is wobbly.

Here’s what I accomplished today:

6      Trim roses in the backyard                Yard         DONE – June 2nd

9      Distribute soil in front flower bed             Yard        DONE – June 2nd

19     Note loose doors and missing knobs                Kitchen       DONE – June 2nd

23     Find scratch and dent appliance stores               Kitchen     DONE – June 2nd

24     Touch up red paint in kitchen              Kitchen      DONE – June 2nd

30     Clean tiles around fireplace              Living Room      DONE – June 2nd

79     Vacuum the carpet and closet       Master Bedroom DONE – June 2nd

91     Change the oil in my car *50,000 miles*   Online/Other   DONE – June 2nd